Building in a Flood Overlay in Victoria: Special Building Overlay and LSIO Explained

By :
November 19, 2026
Rear of a ROMAAC custom home in Camberwell at dusk, with a glazed gable, outdoor dining area and a wide lawn in front

You can usually build on land in a Special Building Overlay or a Land Subject to Inundation Overlay. Both are Victorian planning controls that mark land a major flood can reach, and neither is a blanket ban on building. What they add is a planning permit for most buildings and works, a referral to Melbourne Water or the local Catchment Management Authority, and a floor level set above the flood level by a safety margin. This guide explains each step.

ROMAAC Group designs and builds custom luxury homes, renovations and extensions in Victoria and Queensland, with services that run from pre-construction consultation and architectural design through to construction and project management. On a block with a flood overlay, the order of work matters most: flood level first, design second, permits third.

Rules in this guide were checked on 17 November 2026. Overlays and flood levels differ by property, so confirm yours with Melbourne Water or your Catchment Management Authority, the council and a registered building surveyor.

What Is a Flood Overlay?

A flood overlay is a planning control on your council's planning scheme maps. It marks land that a 1 per cent Annual Exceedance Probability (AEP) flood would reach: a flood with a one per cent chance of happening in any given year, often called the 1 in 100 year flood. It does not stop you building, but most buildings and works need a planning permit, and the design must let floodwater pass and pool as it does now without a significant rise in flood levels.

Melbourne Water's guide to flood planning controls describes the original set as one zone and three overlays, and the state's practice note on the original flood provisions splits them by type of flooding. Mainstream flooding, where rivers, creeks or the coast overflow, is mapped by the Land Subject to Inundation Overlay, the Floodway Overlay and the Urban Floodway Zone. Stormwater flooding, where heavy rain overwhelms the drains and runs across the ground as overland flow, is mapped by the Special Building Overlay. The maps change as flood studies are updated, and some land that may flood is not yet shown on them. Other overlays, such as heritage or design and development overlays, work differently.

The Special Building Overlay (SBO) Explained

The Special Building Overlay marks urban land that floods when stormwater overflows the drainage system and runs across the ground. Under the Special Building Overlay clause, a planning permit is needed for most buildings and works, including fences, pools, decks and verandahs, unless an exemption applies.

The overlay exists mostly because of older drains. The practice note puts it plainly: "Before 1975, drainage systems were designed to a lower standard than those used today." It is mainly used in metropolitan Melbourne, though it can also apply in regional towns. An application needs a site plan with ground and floor levels to Australian Height Datum (AHD, the national reference that surveyed heights are measured from), taken by or under a licensed land surveyor. Melbourne Water says some SBO applications may qualify for VicSmart, the faster permit stream for straightforward proposals.

What the SBO means for a knock down rebuild or an extension

The SBO's standard exemptions are much wider than the LSIO's, and they decide whether a rebuild or extension needs a flood permit at all. The key one exempts works "To a replacement building (not including an out-building) if it is constructed to at least 300mm above the flood level and the original building footprint remains the same." So a knock down rebuild with a larger or reshaped footprint needs a permit, and the council may ask for evidence of the old footprint. An upper storey extension is exempt outright, which matters when weighing up a ground floor or second storey extension.

WorkExempt from the SBO planning permit when
Upper storey extensionExempt, with no floor level condition
Replacement building, or alteration to an existing oneSame footprint, with floors at least 300 mm above the flood level
Extension under 20 square metresFloors at least 300 mm above the flood level, or the floodplain management authority agrees in writing that the flow path is not obstructed
FencingAt least 25 per cent openings with the plinth at least 300 mm above the flood level, or a like-for-like replacement
In-ground pool and safety fencingPool edging at natural surface level, with excavated soil removed from the flow path
Pergola, open deck or carportUnenclosed foundations; a carport over an existing car space

Two cautions. The zone, another overlay or the overlay's schedule can still require a permit. And when the overlay exempts the work, no planning permit sets the floor level, so on land the council records as a designated flood-prone area the building permit will need the council's report and consent (step 5 below).

The Land Subject to Inundation Overlay (LSIO) Explained

The Land Subject to Inundation Overlay marks flood-prone land near rivers, creeks and the coast that the 1 per cent AEP flood reaches, in rural and urban areas. It generally carries a lower flood risk than the Floodway Overlay. Applications go to the floodplain management authority, the body that holds the flood information and assesses proposals against it: Melbourne Water in the Port Phillip and Westernport region, and a Catchment Management Authority elsewhere.

Under the Land Subject to Inundation Overlay clause, a permit is needed for buildings and works including fences, pools and spas, decks and verandahs, and the standard exemptions are narrow unless your area's schedule adds more. The council must also consider whether the development "could be located on flood-free land or land with a lesser flood hazard outside this overlay." Flood depth and speed on the way in and out are assessed too.

LSIO vs SBO vs Floodway Overlay

ControlType of floodingWhat stands out
Special Building Overlay (SBO)Stormwater overland flow, mainly metropolitan MelbourneWide standard exemptions; surveyed levels with the application; some applications can use VicSmart
Land Subject to Inundation Overlay (LSIO)Rivers, creeks and the coast, rural and urbanPermit for most buildings and works, including fences and pools; few exemptions
Floodway Overlay (FO)Waterways, major flood paths and high hazard areasFlood risk report needed unless a local floodplain development plan applies; no new lots entirely within it
Urban Floodway Zone (UFZ)Urban land with high potential flood riskControls land use as well; development generally not encouraged
Flood Management Overlay (FMO), newRiverine, coastal and stormwater flooding at moderate to very high riskRequirements set in a schedule; being introduced area by area (see below)

A Floodway Overlay or the Urban Floodway Zone is a much harder brief than an SBO or LSIO. The state's practice note on planning permit applications under the flood provisions warns that some buildings may not be allowed, or may need to be redesigned or relocated.

How to Check If Your Property Is in a Flood Overlay

Check the address, then get the flood level: an overlay shows where flooding reaches, not how high the water would rise on your block.

  1. Search the address on VicPlan, the state's planning map, to see the zones and overlays.
  2. Search it in the Flood Risk Rating tool, which gives current flood information and will show a rating once the new provisions apply there.
  3. Get the flood level. Melbourne Water's building and renovation guidance lists its property flood level service, LANDATA and Dye & Durham. Buyers can also request a flood level certificate. Outside Greater Melbourne, ask the Catchment Management Authority.
  4. Ask the council whether the land is in a designated flood-prone area and whether it has its own flood mapping.

That last check matters because an overlay is not the whole picture. The City of Boroondara, for example, notes properties its flash flood study found at risk on property information statements under Building Regulation 153, and its guidance on building on flood-prone land warns: "Note that any property within Boroondara could be at risk of flooding now or in the future, even if it wasn't identified in our study." Boroondara also offers a free flood assessment report before plans are drawn; ask your council what it offers.

Can You Build on a Flood Overlay? The Approval Process Step by Step

In the SBO and LSIO the answer is usually yes, if the design meets the floodplain management authority's criteria. Building in a flood zone in Victoria means a planning permit and a building permit, and the floor level must be fixed before the plans are finished.

  1. Get the flood level before design starts. Melbourne Water's pre-development advice gives flood levels and requirements, and the council won't issue a planning or building permit until Melbourne Water has approved the plans. Settling this early is the point of pre-construction consultation.
  2. Design to the five consent criteria. Melbourne Water's consent requirements say works must not reduce floodwater flow or storage capacity, must avoid hazardous flood depth and flow on the site and its access, and "must meet minimum floor level height (above flood level) relevant to development location (freeboard)". Freeboard is the safety margin above the flood level.
  3. Survey and check for assets. A licensed land surveyor records levels to AHD. If Melbourne Water assets are on or near the property, its written approval is needed for the building permit, and drainage easements on the title can limit where the house goes.
  4. Lodge the planning permit application. The council refers it to the floodplain management authority. In a Floodway Overlay a flood risk report is also needed, and for a single dwelling the practice note says it can be simple and prepared by the landowner.
  5. Get the building permit. At the building permit stage, regulation 153 of the Building Regulations 2018 requires the council's report and consent in a designated flood-prone area, unless a planning permit already regulates the lowest floor level. The council must refuse consent if flooding is likely to endanger the occupants. Garages, carports and sheds (Class 10 buildings), unenclosed floor areas and alterations adding no more than 20 square metres are outside this rule. Melbourne Water may also ask for a flood velocity statement for the Building Code, and in designated flood-prone areas the national standard for buildings in flood hazard areas applies.

Minimum Floor Levels and Freeboard

Cross-section diagram showing natural ground, the flood level, freeboard and the protection level, with the house floor above the garage

The floor of a new home is set at the flood level plus freeboard. Without a planning permit, the building regulations set a minimum of 300 mm. With one, floodplain management authorities apply a range, "typically 300 mm to 600 mm", depending on how floodwater behaves at the site. These figures come from the state's Guidelines for Development in Flood Affected Areas (February 2019), which Melbourne Water uses when it assesses proposals.

Flood level, freeboard and the Nominal Flood Protection Level

  • Flood level: the height, to AHD, the 1 per cent AEP flood is expected to reach at the property, supplied by the floodplain management authority.
  • Freeboard: the margin added above the flood level so floors stay dry. Higher figures can apply where flood information is less reliable, the catchment is steep, waves are a factor or climate change is allowed for.
  • Nominal Flood Protection Level (NFPL): the flood level plus freeboard, and the minimum floor level for a new or replacement dwelling.

As the guidelines put it, "Raising floors higher than the flood levels is the easiest way to reduce flood damage".

Different floor levels for houses, garages and sheds

BuildingTypical minimum floor level (2019 guidelines)
New or replacement dwellingNFPL
Dwelling extensionDepends on its size and the existing floor level
Garage1 per cent AEP flood level
Shed under 20 square metresNone
Shed of 20 to 40 square metres1 per cent AEP flood level
Shed over 40 square metresNFPL

Where an existing floor is already below the flood level, some smaller extensions can match it, while larger ones generally go to the NFPL. DEECA, the state environment department, is updating this guidance, and the level that counts is the one in the authority's advice for your property, so confirm it with Melbourne Water or the Catchment Management Authority and your building surveyor before the design is fixed.

How a Flood Overlay Shapes the Design of a New Home

Stone-clad entry of a ROMAAC custom home in North Warrandyte, with wide steps rising from the path to a timber front door

House design for flood-prone areas starts from the required floor level, because it fixes how the house meets the ground.

  • Entries. A raised floor needs steps or ramps at the front door and to outdoor areas, so plan step-free access from the start.
  • Changes of level. A garage can sit at the flood level and living areas at the NFPL, leaving steps between them, which split-level layouts can absorb.
  • Siting and flow. The guidelines mention placing a building on the highest feasible part of the site. Fill, walls and solid fences are assessed for their effect on flood flow and storage.
  • Basements. Every basement entry needs a continuous crest at or above the NFPL.
  • Materials and services. Anything below the 1 per cent AEP flood level should be flood-resistant, and essential services should be flood proofed or raised above the NFPL.
  • Structure. The Building Code's standard compliance route applies only where flood velocities are under 1.5 metres per second; above that, an expert must design the building.
  • Pools. In the SBO an in-ground pool at natural surface level is exempt from the overlay permit; in the LSIO a pool needs one.

These choices affect each other, which is why designing the house around the required floor level works better than adjusting a finished plan.

Flood Overlays Are Changing: Flood Risk Ratings and the Flood Management Overlay

Victoria is moving to a risk-based flood system, area by area. The SBO and LSIO remain in planning schemes and still apply where they are mapped, so check which provisions cover your property.

  • The statewide flood reforms were announced in October 2025, and a new Flood Management Overlay was added to the Victoria Planning Provisions on 19 October 2026 by amendment VC317. It covers riverine, coastal and stormwater flooding at moderate, high and very high risk.
  • Under the state's flood planning and building reforms, five flood risk ratings run from FRR1 (low) to FRR5 (extreme), and low-risk areas will be managed through the building system rather than planning permits.
  • The new provisions are being applied through new or updated flood studies, and Melbourne Water is releasing updated mapping across Greater Melbourne in stages over the next few years.
  • The practice note on permit applications sums it up: "During this transition, different areas of Victoria will be subject to either the new or the original provisions."

The sources give no single changeover date, so recheck VicPlan and the Flood Risk Rating tool before you lodge, not only when you buy.

Building in a Flood Area in Queensland

The Special Building Overlay and LSIO are Victorian controls, so they do not apply in Queensland. There, each council maps flood-prone land in its own planning scheme. Brisbane City Plan 2014's flood overlay code sorts its Flood overlay into flood planning areas for the Brisbane River, creeks and waterways, and overland flow, and notes that the mapped area "may not reflect the full extent of the flood affected area." The City of Gold Coast's guidance on planning for flood points to the Flood overlay in its City Plan.

Building rules sit alongside the planning scheme. Under section 8 of the Building Regulation 2021, a council can designate a flood hazard area and declare its defined flood level (the expected flood height), a freeboard of more than 300 mm and the floor level for houses. Where it has, Queensland Development Code Mandatory Part 3.5 applies to building work there, so that the house resists flotation, collapse or significant permanent movement caused by flood water.

In Brisbane, the FloodWise Property Report shows a property's flood levels and the minimum habitable floor level for a house, which the council describes as the 1 per cent AEP flood level of the highest flood type plus 0.5 metres. On the Gold Coast, a flood level search report gives the designated flood level, and the council requires habitable floors at or above it plus a minimum freeboard of 300 mm. As in Victoria, settle the floor level before the design is fixed.

FAQs

1. Does a flood overlay affect home insurance?

Insurance sits outside the planning system, and insurers use their own definitions of flood. Boroondara council recommends checking that your policy covers flash flooding from overland stormwater flow. Ask your insurer how it treats the property before you buy or build.

2. Will my neighbours be notified of a planning application in a flood overlay?

Not because of the flood overlay. SBO and LSIO applications are exempt from the overlay's notice requirements, but the zone or another overlay on the same land can still require notice.

3. Can a flood overlay be removed from my property?

Overlays change only when flood information is updated and the planning scheme is amended. If you believe the mapping is wrong, raise it with the council and the floodplain management authority.

Find the Flood Level Before You Draw the Floor Plan

A Special Building Overlay or LSIO adds steps to a new home, rebuild or extension and changes the order of work: flood level, then a design that meets the authority's criteria, then the permits. If you are planning a custom home or rebuild on flood-affected land, talk to ROMAAC about a block with a flood overlay before the floor plan is drawn.

Vector (8)
Explore expert tips and trends in premium construction and architectural design.
Get In Touch
Get In Touch
Arrow
CHECKOUT OUR LATEST BLOG POSTS
Stepping-stone path across a lawn to an outdoor pizza oven in the garden of a ROMAAC custom home in North Warrandyte, under tall trees
November 19, 2026
Luxury Acreage Home Designs in Queensland: Layouts, Climate and Site Rules
This is some text inside of a div block.
Kitchen in a ROMAAC custom home in Camberwell, with a stone island, raked timber ceiling and a glazed gable looking out to the pool
November 19, 2026
Period Home Extensions in Melbourne: Joining Old and New
This is some text inside of a div block.
Lit pool and covered outdoor room at a ROMAAC custom home in North Warrandyte at night, with glass doors open to the living area
November 19, 2026
Renovating a 1950s Weatherboard House: Keep, Extend or Rebuild?
This is some text inside of a div block.