A Design and Development Overlay (DDO) is a Victorian planning control that applies a council schedule of built-form rules, such as building height, setbacks, site coverage and fences, to a defined area. For a new home it usually means two things: a planning permit may be needed even for a single house, unless the schedule exempts it, and the schedule's numbers can be stricter than the zone's. This guide shows how to find your schedule, read it and design to it.

ROMAAC Group designs and builds custom homes, renovations and extensions in Victoria and Queensland, and offers pre-construction consultation for the planning stage before a build. On a block with a DDO, the schedule is one of the first documents worth reading at that stage, because its numbers set the outline of the house before any room is drawn.

Planning rules in this guide were checked on 19 November 2026. Schedules differ between councils and change by amendment, so confirm the schedule for your own property with the council, a town planner or a registered building surveyor.

What Is a Design and Development Overlay?

A Design and Development Overlay is Clause 43.02 of the Victoria Planning Provisions, the state-wide rules that council planning schemes draw on, and its stated purpose is "To identify areas which are affected by specific requirements relating to the design and built form of new development." It appears on the planning scheme map as DDO with a number, and each number points to a schedule that sets the actual rules for that area.

The clause itself holds no numbers. Each schedule must state design objectives for its area, and most then set out what needs a permit and the requirements buildings must meet. A DDO does not change the zone, manage land use or act as a heritage control, as the City of Yarra's DDO explainer notes, so the zone and any other overlays still apply alongside it. The state's practice note on mandatory provisions calls the DDO "the most appropriate tool to implement mandatory built form requirements", which is why some schedules contain limits no permit can vary.

How a DDO differs from other overlays

Several overlays affect what can be built, but each does a different job. The DDO deals with the size, siting and look of new buildings, and unlike a Heritage Overlay it does not control demolition.

OverlayWhat it is forControls demolition?
Design and Development Overlay (43.02)Design and built-form requirements for an area, such as height and setbacksNo
Heritage Overlay (43.01)Conserving heritage places of natural or cultural significanceYes
Neighbourhood Character Overlay (43.05)Areas of existing or preferred neighbourhood characterOnly if the schedule says so
Development Plan Overlay (43.04)Areas where a development plan must be approved before permits are grantedNo
Built Form Overlay (43.06)Higher density development close to infrastructure and public transportNo

Because a DDO cannot stop an old house coming down, on an established block that question sits with any heritage and neighbourhood character overlays on the land.

If you are building in Queensland

The Design and Development Overlay is a Victorian planning control, so it does not apply to a block in Queensland. Queensland councils set comparable built-form rules in their own planning schemes, through zones, overlays and neighbourhood plans, while the Queensland Development Code covers matters such as boundary setbacks for houses. In Brisbane City Plan 2014's dwelling house code, for example, the acceptable height for a house in the Low density residential zone is up to 9.5 metres and 2 storeys, and a zone precinct, neighbourhood plan or overlay can vary that outcome.

How to Check Whether Your Property Has a DDO

Start with a planning property report for the address, which lists the zone and every overlay, with links to the provisions in the local planning scheme. The overlay name alone tells you nothing about the numbers, so take four steps.

  1. Get the property report, or look the address up in VicPlan, and note each overlay and its number, such as DDO4.
  2. Open that numbered schedule in the council's planning scheme; the report links straight to it.
  3. Find your street or lot in any table or map inside the schedule, because one schedule can set different numbers street by street.
  4. Note the zone and other overlays, since they still apply and can add their own permit triggers.

What a DDO Schedule Can Control

Diagram of how a DDO schedule limits a house: maximum height, front and rear setbacks, side setback, site coverage and front fence

Clause 43.02 lets a schedule set requirements for building setbacks, building height, plot ratio, landscaping and any other aspect of the design or built form of new development. Residential schedules reach well beyond height, as these examples from Bayside DDO2, Manningham DDO4, Boroondara DDO31 and Stonnington DDO4 show.

ControlExample requirementSchedule
Height and storeys2 storeys and 9 metres, or 10 metres on a slopeBayside DDO2
Side and rear setbacks1.8 metres from a side boundary, more for taller walls; 5 metres from the rearManningham DDO4
Setback from a river30 to 150 metres, set street by streetBoroondara DDO31
Site coverage and permeable area35 per cent coverage, at least 50 per cent garden or other pervious surfaceManningham DDO4
Upper floor sizeNo more than 75 per cent of the ground floor areaManningham DDO4
Front fencesA permit above 1.2 metres, with set materials and coloursStonnington DDO4
EarthworksNo more than 1 metre of cut or fillManningham DDO4
Garages and crossoversGarages at least 1 metre behind the front of the house; usually one crossoverManningham DDO4
Colours and materialsNon-reflective finishes that blend with the landscapeBoroondara DDO31
Number of dwellingsOne dwelling per lotManningham DDO4

Mandatory and discretionary requirements

Most numbers in a schedule can be varied with a planning permit, because Clause 43.02 allows a permit for works that do not meet a schedule requirement "unless the schedule specifies otherwise". The state's practice note defines a mandatory provision as one that must be met with no opportunity to vary it, and a discretionary one as allowing flexibility in how the outcome is achieved. Most mandatory provisions are for building heights.

The schedule's wording tells you which is which. Manningham DDO4 limits each lot to one dwelling and states: "A permit cannot be granted to vary this requirement." Boroondara DDO31 sorts its rules into requirements that cannot be varied by a planning permit, including its maximum heights and river setbacks, and requirements that can, including its 40 per cent site coverage limit.

Do You Need a Planning Permit to Build a House in a DDO?

Often, yes. Clause 43.02 requires a planning permit to construct a building or carry out works unless the schedule says one is not required. Without a DDO or another overlay, one house on a lot of 300 square metres or more in the General Residential Zone or Neighbourhood Residential Zone needs no planning permit under the zone, because both zones require one only on a lot under 300 square metres. On many suburban blocks, the DDO is the reason a new house needs a planning permit at all.

Many residential schedules exempt houses that stay within set limits. Bayside DDO2 needs no permit for a building of up to 2 storeys and 9 metres, or 10 metres on a slope of 2.5 degrees or more. Manningham DDO4 needs no permit for a house that meets all its siting, height, coverage, parking and earthworks conditions. Stonnington DDO4 needs no permit for buildings at all, only for fences above set heights.

Clause 43.02 also exempts an outdoor pool associated with a house, unless the schedule deals with pools, and a small second dwelling no higher than 5 metres and finished in muted tones. A permit for a fence, carport, garage, pergola, verandah, deck, shed or pool associated with a house can usually go through VicSmart, the state's streamlined permit process. Whatever the planning answer, a new house also needs a building permit from a registered building surveyor.

How a DDO works with the zone and Clause 54

The zone sets a default height that applies whether or not a permit is needed: 11 metres and 3 storeys in the General Residential Zone and 9 metres and 2 storeys in the Neighbourhood Residential Zone, unless the zone schedule says otherwise. A house must meet both the zone and the DDO, so in practice the stricter figure sets the ceiling.

Where a house needs a permit under the zone, it is assessed against Clause 54, the standards for one dwelling on a lot often called ResCode, and a DDO standard that modifies a Clause 54 standard takes priority. Building rules follow the same logic: under regulation 68 of the Building Regulations 2018, a siting rule in Part 5 does not apply when a planning permit is required and the planning scheme regulates the same matter. In that case, the schedule's numbers become the rulebook.

Three Real DDO Schedules Compared

Schedules range from a single height control to a full set of siting rules, as these three Melbourne examples show.

RequirementBayside DDO2 (building height control, inland areas)Manningham DDO4 (Templestowe environmental residential area)Boroondara DDO31 (Yarra (Birrarung) River corridor)
AimLow-rise suburbs of up to two storeys with a strong garden characterBushland and low-density characterBuildings set back from the river, without visual bulk
Permit for a house?Not within the height limitNot if every condition is metYes; no exemption for buildings
Height2 storeys and 9 metres (10 on a slope)8 metres above natural ground8 or 9 metres by street, plus up to 1 metre on a slope
SetbacksNone in the scheduleFront in line with or behind neighbours; side from 1.8 metres; rear 5 metres30 to 150 metres from the river-side boundary
Site coverageNone in the schedule35 per cent40 per cent, including pools and hard surfaces
FencesNone in the scheduleFront fence up to 1.2 metres and at least 50 per cent transparent without a permitPermit near the river or parkland unless 1.4 metres or lower, post and rail or post and wire
Fixed (mandatory) elementsNone; a taller house can seek a permitOne dwelling per lotHeight, river setback and no extra midwinter shadow across the river-side boundary

River corridor schedules from the same state amendment (VC197) also apply in Stonnington (DDO3), Manningham (DDO2), Nillumbik (DDO10) and Banyule (DDO2), each with its own table of streets. These are examples only: the schedule on your own property report is the one that applies.

What a DDO Means for a Knock Down Rebuild, Second Storey or Extension

Pool and covered terrace beside a ROMAAC custom home in North Warrandyte, with paving, glass fencing and garden trees beyond

Knock down rebuild

A replacement house is new buildings and works, so the schedule's permit trigger and numbers apply in full to a knock down rebuild. The residential zones let a replacement building match the height of the one it replaces, but that allowance belongs to the zone, not the DDO. Some schedules add their own rule: in Boroondara DDO31, a replacement inside the river setback must not be taller than the maximum height, closer to the river or larger in floor area than the existing building.

Second storey

The height and storey limits decide whether a second storey is possible at all. Manningham DDO4 also caps the upper floor, balconies included, at 75 per cent of the ground floor area, and Bayside DDO2 states that "an attic, mezzanine and built over car parking area are each considered to be a storey." Check those definitions before choosing between a ground floor or second storey extension.

Ground floor extension

Coverage limits are measured across the whole site. Manningham DDO4 counts existing buildings, and Boroondara DDO31 also counts pools, tennis courts and other hard surfaces, so a rear extension or new terrace can reach the coverage cap before it reaches a setback.

How a DDO Shapes the Design of a New Home

Treat the schedule as the first page of the design brief. Its numbers draw the outline of the house before a single room is placed.

  • Height is measured from natural ground, and where a schedule allows an extra metre on a slope, that metre can decide between a full second storey and one of the split-level designs that step down the block.
  • Side setbacks that grow with wall height, and an upper floor capped at a share of the ground floor, pull the bulk of the house in from the boundaries.
  • Coverage, permeable-area and earthworks limits shape the footprint, driveway, pool and how much cut and fill a sloping block can take.
  • Where a permit is needed, the application must show how the design meets the objectives. Bayside DDO2 asks for a neighbourhood and site description and a design response; Boroondara DDO31 asks for a surveyor's site plan, shadow diagrams, a materials schedule and a landscaping plan.

The practical order is to settle the schedule's numbers first, then move to designing the house around the schedule, with a town planner involved where a permit is likely.

Recent Changes to Victoria's Residential Rules

Clause 43.02 was last changed in April 2026, when amendment VC307 raised the cost thresholds for VicSmart applications. The residential rules around it have changed more often:

  • VC282 (September 2025) introduced a new Clause 54 for one dwelling or a small second dwelling on a lot, and VC315 (September 2026) refined it. Applications lodged before VC315 continue under the earlier version.
  • VC306 (October 2026) made small second dwellings and movable units easier to develop.
  • VC317 (October 2026) restated the zones' height rules and, on flood-affected land, measures height from the minimum floor level set by the drainage or floodplain authority.

Older fact sheets may not reflect these changes, so rely on the planning scheme online.

FAQs

1. Will my neighbours be told about a planning application in a DDO?

Usually the normal notice process applies, but Clause 43.02 lets a schedule exempt applications from notice and review. Stonnington DDO4 does this for fences.

2. Can a DDO change after I buy the land?

Yes. DDOs are added and changed through planning scheme amendments, and councils sometimes introduce interim DDOs, which are temporary and have an expiry date, while permanent controls go through exhibition and an independent panel. Check the property report again before design starts.

Read the Schedule Before You Draw the House

On a block with a DDO, the order matters: property report, then the schedule, then the design, then the planning and building permits. If you are planning a new home, rebuild or extension on land like this, talk to ROMAAC about a block with a design and development overlay before the brief is fixed.

Vector (8)
Explore expert tips and trends in premium construction and architectural design.
Get In Touch
Get In Touch
Arrow
CHECKOUT OUR LATEST BLOG POSTS
Stepping-stone path across a lawn to an outdoor pizza oven in the garden of a ROMAAC custom home in North Warrandyte, under tall trees
November 19, 2026
Luxury Acreage Home Designs in Queensland: Layouts, Climate and Site Rules
This is some text inside of a div block.
Kitchen in a ROMAAC custom home in Camberwell, with a stone island, raked timber ceiling and a glazed gable looking out to the pool
November 19, 2026
Period Home Extensions in Melbourne: Joining Old and New
This is some text inside of a div block.
Lit pool and covered outdoor room at a ROMAAC custom home in North Warrandyte at night, with glass doors open to the living area
November 19, 2026
Renovating a 1950s Weatherboard House: Keep, Extend or Rebuild?
This is some text inside of a div block.