


House extension cost in Australia is usually published as a rate per square metre. In 2026, hipages puts a ground floor extension at $2,000 to $4,000 per square metre, and Archicentre Australia's Cost Guide 2026 puts extensions at $2,700 to $5,100 per square metre for the basic shell. A second storey generally costs more per square metre than building out. These are third-party estimates, not quotes. This guide compares the published ranges and explains what moves the budget for a Melbourne home.
Published figures and Victorian rules in this guide were checked on 13 November 2026. None of the figures is a ROMAAC Group price. Your design, your site and your contract set the cost of your project.
ROMAAC Group designs and builds custom homes, renovations and extensions in Melbourne and across Victoria. Its extensions and additions service is the place to start when you want a figure for your own house instead of a published range.
Two Australian publishers give independent current figures: the trades marketplace hipages, and Archicentre Australia, an architect advisory and property assessment service. Their ranges differ because each one measures something different, so the last column of the table matters as much as the dollar figure.
| Type of work | Published range | Publisher and date | What the figure covers |
|---|---|---|---|
| Ground floor extension | $2,000 to $4,000 per square metre | hipages house extensions cost guide, updated 6 January 2026 | National average. hipages says quotes normally cover roofing, cladding, insulation, windows and doors, and lists flooring, electrical work, heating and cooling, plumbing, plans and council fees, and painting as items you may also need to budget for |
| New construction, including extensions to an existing building | $2,700 to $5,100 per square metre | Archicentre Australia Cost Guide 2026 | The basic shell and the extended roofline only, including GST. Assumes standard materials, good site access and a simple roof. Wet area fit-out, services upgrades, repairs to the existing house, first floor additions and professional fees are extra |
| Renovation inside an existing building | $1,600 to $3,900 per square metre | Archicentre Australia Cost Guide 2026 | Assumes the rooms are in sound condition and need no structural upgrades. Hazardous material removal and temporary accommodation or furniture storage are extra |
| Second storey addition | $1,850 to $3,500 per square metre, and up to $15,000 per square metre for a very large, high-end and complex build | hipages second storey cost guide, updated 23 January 2026 | National average, described as what most builders suggest |
| Wet area fit-out, added to the rates above | Bathroom or ensuite $17,500 to $35,000. Kitchen $23,000 to $49,000. Laundry $10,000 to $19,000 | Archicentre Australia Cost Guide 2026 | The fit-out of each room. White goods are extra |
Published ranges vary widely, and none of them is a quote. These are national figures, not Melbourne ones. Archicentre's rates assume standard materials, fixtures and finishes, good access and a relatively simple roof, so a custom design with premium finishes, or a tight site, sits outside what the guide prices. Its own advice is that accuracy comes once a design is developed, costed by an independent quantity surveyor and taken to competitive tender.
Building out at ground level is the lower-cost way to add floor area in most published guides: $2,000 to $4,000 per square metre according to hipages, or $2,700 to $5,100 for the shell according to Archicentre. Budget Direct's 2026 guide to extension costs repeats the hipages figure as $2,000 to over $4,000 per square metre and puts an 80 square metre extension at $160,000 to $320,000.
The money goes on new footings and a slab or subfloor, walls, a roof tied into the existing roofline, and the opening cut through the back or side of the house. That opening usually needs a beam designed by a structural engineer, because an external wall normally carries roof load.
The costs people miss sit around the new room, not in it. Archicentre notes that its rates leave out upgrades to electrical, plumbing and heating services, and that you may need to allow for paving, landscaping and improved site drainage. A ground floor extension also uses garden, which is the main reason owners of small blocks look at building up. The main types of home extension, from a rear addition to a wraparound, are compared in a separate guide.

A second storey extension costs more per square metre than a ground floor extension in most published guides, and the range is wider. The hipages second storey cost guide gives $1,850 to $3,500 per square metre, rising to as much as $15,000 per square metre for a very large, high-end and complex build, and a ballpark total of $185,000 to $750,000 for 100 square metres. The hipages house extension guide gives a narrower $3,000 to $3,500 per square metre and says a second storey costs about 50 per cent more than a ground floor extension. Budget Direct says up to 50 per cent more. Archicentre gives no separate rate: it lists first floor additions as an extra on top of its extension range.
The extra cost comes from work that a ground floor extension avoids:
The guides are not unanimous. The same hipages guide says building up is often more cost-effective than extending out, because a ground floor extension needs new foundations, while also listing higher cost as a drawback of a second storey. Both can be true. The answer depends on whether the existing structure can take the load with little strengthening, which is a question for a structural engineer who has inspected the house.
Building up tends to suit a small block, a garden worth keeping, or a ground floor that already works and is only short of bedrooms.
None of the published guides gives a Melbourne-only rate. hipages says where you live affects the cost, and Archicentre lists site access, job size, quality and location among the reasons building prices vary considerably. For an established Melbourne house, five factors do most of the work.
A bigger extension costs more in total but often less per square metre. Archicentre notes that larger works can achieve a better value price per square metre. The reason is fixed cost: design, permits, site set-up and the connection to the existing house do not shrink in proportion on a small job. Settle the floor area you need, and whether it goes out or up, before comparing rates.
Wet areas cost more than any other room. Budget Direct explains that they need plumbing, waterproofing, electrical work and fixtures from specialised trades, and Archicentre prices the fit-out separately, at the figures in the table. An extension that is all living space will sit lower in any range than one with a kitchen and two bathrooms. Keeping new wet areas close to existing plumbing and drainage usually reduces the work.
Poor access and demolition add cost before any new work starts. Archicentre's rates assume good access to the site, which a block with a narrow side passage and no rear lane may not offer. Most extensions also begin by removing something, often an older rear addition. The Victorian Asbestos Hub says a home built or renovated before 1990 likely contains asbestos, and that removal is a job for a licensed asbestos removalist.
Building close to a boundary can add another cost. Under the Building and Plumbing Commission's guidance on protecting adjoining properties, the building surveyor decides whether protection work is required. If it is, the owner who is building must insure against damage to the neighbouring property, prepare a survey of its condition with the neighbour, and pay the expenses the neighbour incurs in protecting their interests.
An extension that has to match an older house costs more than one that only has to meet it. Matching brickwork, weatherboard profiles, roof pitch and window proportions can take more labour and specially sourced materials, and Archicentre lists consequential work to the existing building as an extra. Heritage adds an approval step. Planning Victoria's guidance on local heritage protection says that if a property has a Heritage Overlay, you will generally need a planning permit before demolition, exterior alterations and new construction.
If the original rooms are being updated at the same time, treat that as a separate line in the budget. The renovation process for an existing home is covered in its own guide.
Finish is the factor most within your control. Archicentre's ranges assume standard materials, fixtures and finishes, and it names the quality of the job, from a volume-built to a custom-built standard, as a price factor. Full-height glazing, custom joinery, natural stone and carefully detailed junctions between old and new sit above that assumption. The way finish level shapes a budget is set out in the guide to the cost of building a custom home in Melbourne, and the same logic applies to an extension.
A builder's price covers construction. The items below are usually paid separately, or sit outside a rate per square metre, so add them to the budget early.
Four sets of rules shape what an extension costs and how soon it can start. Each is summarised here from the regulator's own page, and a registered building surveyor or building lawyer should confirm how they apply to your project.
Plan on a building permit for any extension. The Building and Plumbing Commission (BPC) states that all building work requires a building permit unless an exemption exists, and the exemptions it lists are minor, such as pergolas, small garden sheds and maintenance repairs. A registered building surveyor issues the permit and, when an extension is finished, a certificate of final inspection.
A planning permit is a separate approval from the council and, where one is required, it must be issued before the building permit. Planning Victoria's single home code guidance says a planning permit is required to extend a house on a lot of less than 300 square metres in a residential zone. On larger lots the residential development standards are, in most cases, assessed with the building permit instead, but an overlay such as a Heritage Overlay can still trigger a planning permit. Check the zone and overlays before design starts, because a planning permit adds drawings, fees and time. The steps are set out in the guide to building permits in Victoria.
Almost every extension must be built by a registered builder under a written contract. Consumer Affairs Victoria says the builder must use a major domestic building contract for work worth more than $10,000, including extensions, and must be registered with the BPC. Its page on deposits and payments sets the legal limit on a deposit at 5 per cent for contracts of $20,000 or more and 10 per cent for contracts under $20,000, with progress payments made as each stage is completed.
Two changes are recent. From 1 July 2026, Home Warranty replaced Domestic Building Insurance for new eligible work valued at more than $20,000, which can include extensions, and BPC warns that it does not protect owners who use an unregistered builder for work that needs a registered one. Consumer Affairs Victoria also advises that new domestic building contract laws take effect by 1 December 2026, under which deposit limits and progress payment stages can be set in regulations. Check the current limits on its website before you sign.
These two contract terms are where a fixed price most often moves. A prime cost item is a fixture or fitting, such as an oven, taps or tiles, that is listed in the contract but not yet identified and costed. A provisional sum is an estimate for work the builder cannot price exactly when the contract is signed. Consumer Affairs Victoria gives excavation as the common example: the cost could increase substantially if rock is found that the soil report did not identify.
Its advice is to avoid both where possible, by choosing fixtures and finishes before signing and making sure the builder has a comprehensive soil report. On an extension, where part of the existing house stays hidden until work starts, ask which allowances in a quote are provisional and what each one is based on.
An extension can bring the current energy efficiency rules with it. BPC's page on energy efficiency requirements says that if you plan to extend or substantially renovate your home, for example by more than 50 per cent, you may need to comply with the current requirements. It describes this as a complicated area that depends on a variety of factors, and says it is best to consult a registered building surveyor on the extent of compliance required. The answer can affect glazing, insulation and how much of the existing house is touched, so raise it at design stage.

Extending is usually weighed against two alternatives, and each carries a cost that an extension avoids. Moving means paying land transfer duty on the next home, which the State Revenue Office confirms you pay when buying property in Victoria, along with agent, legal and removal costs. Rebuilding means demolition and a whole new house.
The comparison tightens as the scope grows. Archicentre uses the same $2,700 to $5,100 per square metre range for new construction and for extensions, and an extension brings extra work to the existing house with it. If the plan is to extend and also renovate most of the original rooms, price a rebuild as well. The guide on whether to renovate or rebuild on an established Melbourne block works through that decision, and the knock down rebuild process is set out step by step.
Published ranges are good for one thing: deciding whether a project is worth designing. A figure you can sign needs a design, a soil report, an engineer's view of the existing structure and a detailed specification. BPC's advice on getting quotes is to get at least three for the same job and to ask for an itemised quote, so inclusions and exclusions can be compared line by line.
To talk through the house you have, the space you need and what it is likely to cost to build, contact ROMAAC Group.


