Luxury Kitchen Renovations in Melbourne, Step by Step

By :
November 8, 2026
Renovated luxury kitchen with a Calacatta marble island and timber veneer joinery in a Melbourne home

Luxury kitchen renovations in Melbourne follow a clear sequence: a brief based on how you use the kitchen, an assessment of the existing house, layout design, final selections, the contract and any approvals, strip-out and rough-in, installation, and handover with the right certificates.

The finish people notice at the end depends on decisions made before demolition starts. Moving a wall, relocating plumbing or changing a rangehood path all affect the design, the paperwork and the programme. This guide walks through each step in the order it happens, from a builder's point of view.

Victorian requirements in this guide were reviewed on 16 October 2026. Your contract and any building permit set the details for your project.

The Renovation at a Glance

Each stage has decisions for you and paperwork for the builder, and both are easier when they happen in order.

  • 1. Brief
  • What happens: Define how the kitchen will be used
  • Your decisions: Cooking, entertaining, storage, pantry
  • Paperwork: Written brief
  • 2. Site assessment
  • What happens: Check structure, services and levels
  • Your decisions: Which walls and services can move
  • Paperwork: Notes on structure and services
  • 3. Layout design
  • What happens: Zones, island, pantry and lighting plan
  • Your decisions: Approve the layout
  • Paperwork: Drawings
  • 4. Selections
  • What happens: Joinery, stone, appliances, tapware, lighting
  • Your decisions: Final choices before pricing
  • Paperwork: Specification
  • 5. Contract and approvals
  • What happens: Price, contract, insurance, permit if needed
  • Your decisions: Sign the contract
  • Paperwork: Contract, Home Warranty cover, building permit
  • 6. Strip-out and rough-in
  • What happens: Demolition, services moved and roughed in
  • Your decisions: Confirm positions on site
  • Paperwork: Written variations if anything changes
  • 7. Installation
  • What happens: Linings, cabinetry, stone, splashback, appliances
  • Your decisions: Approve samples and set-out
  • Paperwork: None beyond variations
  • 8. Fit-off and handover
  • What happens: Connections, testing, defects walkthrough
  • Your decisions: Sign off the defects list
  • Paperwork: Plumbing and electrical certificates, manuals, warranties

1. Start With How You Use the Kitchen

A luxury kitchen is designed around the people who use it, so the brief comes before any drawings or showroom visits.

Describe how you cook, how often you entertain, who uses the kitchen at the same time, and what needs storing. These answers decide whether you need a second sink, a larger fridge and freezer space, a coffee station, or a butler's pantry to keep preparation and cleaning out of sight. Bring photos of kitchens you like, but note what you like about each one, such as the joinery, the light or the layout, so the design responds to the reason rather than copying a picture.

2. Assess the Existing House

An existing home sets limits that a new build does not, so a builder should check structure and services before design goes far.

  • Structure: which walls are load-bearing, and what is needed to open them up.
  • Plumbing and gas: where the waste, water and gas lines run, and how far they can move.
  • Electrical capacity: whether the switchboard can handle induction cooking, ovens and other new loads.
  • Ventilation: a practical path for the rangehood ducting to the outside.
  • Floor levels: how new flooring will meet the rooms around the kitchen.

Some changes need a building permit. Victoria's Building Practice Note BP-01 explains that the permit exemption for alterations does not cover work that removes or alters part of the building supporting another part, such as a load-bearing wall. Non-structural changes may be exempt, but only if they meet every condition in the practice note. If a bigger change is on the table, comparing renovating against rebuilding is worth doing at this stage.

3. Design the Layout

The layout sets how the kitchen works every day, so it is settled before any finishes are chosen.

Good layouts separate cooking, preparation, cleaning and storage so people are not crossing paths, and leave generous space around the island. A butler's pantry can take the mess and small appliances away from the main kitchen, which matters when the kitchen opens to living areas. Plan sightlines too: what you see from the living room and the garden. The lighting plan belongs here, with task lighting over benches, feature lighting over the island and joinery lighting placed so it sits in a recess rather than on show.

4. Lock In Selections

Joinery, stone and appliances set dimensions for everything else, so they should be final before pricing and construction.

Integrated appliances decide the joinery sizes. Stone selection decides where benchtop joins fall and how veins run across the island. Tapware and sinks decide the plumbing positions. In ROMAAC's Camberwell project, the kitchen pairs Calacatta marble benchtops with premium veneer joinery and Abbey tapware.

The guide to custom finishes for high-end homes covers material choices in more detail, and features such as a butler's pantry or wine storage are covered in the guide to luxury home features.

Changing a selection after work starts usually means a variation, extra cost and a delay, so take the time to see samples in your own light before you commit.

‍

Vector (8)
Explore expert tips and trends in premium construction and architectural design.
Get In Touch
Get In Touch
Arrow

5. Contract, Insurance and Approvals

A luxury kitchen renovation is usually large enough to need a formal contract, and sometimes insurance and a permit.

  • Contract: if the work involves more than one trade and is worth more than $10,000, you need a major domestic building contract before work starts, and only registered builders can enter into one (Consumer Affairs Victoria).
  • Home Warranty: the Victorian Government's scheme covers eligible domestic building contracts over $20,000 signed on or after 1 July 2026 (vic.gov.au). Ask your builder to confirm whether your contract is covered.
  • Building permit: needed for structural changes such as removing a load-bearing wall.
  • Variations: any change to the plans or specification should be priced and agreed in writing before the work is done.

6. Strip-Out and Rough-In

Opened-up kitchen wall showing new plumbing and electrical rough-in during a renovation

Once the old kitchen is removed, services are moved and roughed in while the walls and floor are open.

Before demolition, the rest of the house is protected with floor coverings and dust screens. The old kitchen is stripped out, any structural work is completed, and plumbing, gas, electrical and data are run to their new positions. This is the last chance to move a power point, add a joinery light circuit or shift a tap position without opening finished walls. If you are living at home during the works, agree a temporary kitchen set-up and site access arrangements before this stage starts.

7. Installation

Stonemason templating a kitchen benchtop on newly installed cabinets during a renovation

Installation runs in a fixed order, and each trade relies on the one before it being accurate.

Walls and ceilings are lined and set, then cabinetry is installed and levelled. Stone benchtops are templated on site once the cabinets are in place, so the stone fits the actual joinery rather than the drawings. Benchtops, splashback, sinks and appliances follow. Accurate set-out and protection of finished surfaces at this stage decide how the kitchen looks at handover; the guide to a high-end architectural finish explains what to look for.

8. Fit-Off, Certificates and Handover

Homeowner and builder reviewing appliance manuals at a marble kitchen island at handover

Handover is when systems are tested, certificates are issued and any defects are listed for fixing.

At fit-off, appliances, tapware and lighting are connected and tested. Two certificates matter for a kitchen:

  • Plumbing compliance certificate: a licensed plumber must issue one when the total value of plumbing work exceeds $750, including materials, appliances, labour and GST, and for some gas work regardless of cost. It must reach you within five days of the work being completed (Building and Plumbing Commission).
  • Certificate of Electrical Safety: issued by the Registered Electrical Contractor who did the electrical work (Energy Safe Victoria).

Walk through the finished kitchen in daylight and with the lights on. Open every drawer and door, check joins in the stone, and record any defects in writing with photos. Keep the manuals and warranties for every appliance together for later.

Planning a Luxury Kitchen Renovation

A kitchen renovation that follows these steps avoids most surprises on site. ROMAAC Group offers renovation and remodelling for homes across Melbourne. Make an enquiry to talk through your kitchen.

FAQs

1. Do I need a building permit for a kitchen renovation in Victoria?

Not always. A building permit is generally needed if the work removes or alters part of the building that supports another part, such as a load-bearing wall. Non-structural internal changes may be exempt if they meet every condition in Building Practice Note BP-01. Your builder or a building surveyor can confirm what applies to your plans.

2. Do I need a written contract for a kitchen renovation?

If the work involves more than one trade and costs more than $10,000, Victorian law requires a major domestic building contract before work starts, and only a registered builder can enter into one. Consumer Affairs Victoria recommends a written contract for all building work, whatever its size, with variations agreed in writing.

3. What certificates should I get when my kitchen is finished?

A plumbing compliance certificate from the licensed plumber, required when plumbing work is worth more than $750 and for some gas work, and a Certificate of Electrical Safety from the Registered Electrical Contractor. Keep these with your appliance manuals and warranties, and ask for any building permit documents if structural work was done.

4. Can I add a butler's pantry in a kitchen renovation?

Often, yes, if there is space next to the kitchen or a room that can be reworked. A butler's pantry needs plumbing, power and ventilation, so the existing services and structure affect how practical it is. Assess this before the layout is designed, because it changes how the main kitchen works.

5. Should I use a builder or a kitchen company for a luxury renovation?

A kitchen company is suited to replacing cabinetry within the same layout. If the renovation moves walls, relocates plumbing or gas, upgrades electrical capacity or changes flooring across rooms, a registered builder can manage the structure, services, trades and paperwork under one contract, which is required for multi-trade work over $10,000.

‍

CHECKOUT OUR LATEST BLOG POSTS
November 13, 2026
Queenslander House Guide: Features, History and Modern Queenslander Designs
This is some text inside of a div block.
November 13, 2026
Cost Plus Contract vs Fixed Price: Costs, Risks and Differences in Victoria
This is some text inside of a div block.
November 13, 2026
Raked Ceiling Designs: Benefits, Costs and Comparison With Vaulted Ceilings
This is some text inside of a div block.