Luxury Renovations in Melbourne: How the Process Works

By :
November 8, 2026
Renovated Melbourne period home with its original façade retained and a contemporary interior visible

Luxury renovations in Melbourne follow a set sequence: check feasibility, write the brief, design and document, obtain approvals, sign the contract, prepare the household, build, then complete inspections and handover. Renovating an existing home needs more investigation than building new, because the structure, services and planning controls are already in place and not always as expected.

Many Melbourne homes also sit in a Heritage Overlay, which shapes what can change on the outside. This guide walks through each stage in the order it happens, so you know what to decide and when.

Victorian requirements in this guide were reviewed on 16 October 2026. Your contract, planning permit and building permit set the details for your project.

The Renovation Process at a Glance

Each stage has its own people and paperwork, and the early stages decide how smoothly the later ones run.

  • 1. Feasibility
  • What happens: Check planning controls, structure and services
  • Who is involved: You, builder, design team
  • Approvals and paperwork: Planning Property Report
  • 2. Brief
  • What happens: Agree what changes and what stays
  • Who is involved: You, design team
  • Approvals and paperwork: Written brief
  • 3. Design and documentation
  • What happens: Survey, concept, engineering, drawings, specification
  • Who is involved: Design team, engineer
  • Approvals and paperwork: Drawings and specification
  • 4. Approvals
  • What happens: Planning permit if required, building permit
  • Who is involved: Council, building surveyor
  • Approvals and paperwork: Planning permit, building permit
  • 5. Contract
  • What happens: Price, contract, insurance, payment schedule
  • Who is involved: You, builder
  • Approvals and paperwork: Major domestic building contract, Home Warranty
  • 6. Preparation
  • What happens: Decide whether to move out, protect retained areas
  • Who is involved: You, builder
  • Approvals and paperwork: Site access and protection plan
  • 7. Construction
  • What happens: Strip-out, structure, services, linings, finishes
  • Who is involved: Builder, trades, building surveyor
  • Approvals and paperwork: Inspections, written variations
  • 8. Handover
  • What happens: Final inspection, certificates, defects walkthrough
  • Who is involved: Builder, building surveyor, you
  • Approvals and paperwork: Certificate of Final Inspection, compliance certificates

1. Check Feasibility Before You Design

Builder and homeowner inspecting the subfloor framing of an older Melbourne house before a renovation

Feasibility tells you what the site and the existing house will allow before you spend money on design.

Start with a Planning Property Report from Planning Victoria, which shows the zone and any overlays that apply to your property. Then have the existing house assessed: the condition of the structure, roof and subfloor, the capacity of the electrical supply, the age of the plumbing and drainage, and any signs of movement or moisture.

Older homes often hide problems that only show once walls and floors are opened, so a contingency allowance in the budget is sensible.

If the assessment raises big questions, compare the options early. Weighing up whether to renovate or rebuild at this point avoids designing a renovation that a rebuild would have suited better.

2. Write the Brief

A clear brief separates what must change from what should stay, which matters more in a renovation than a new build.

List the rooms you want to change and why, how you want to live in the house, and which existing features you value, such as period ceilings, fireplaces or a façade.

Decide your priorities in case the budget forces trade-offs. If you are considering features such as a butler's pantry, cellar or ensuite retreat, the guide to luxury home features explains what each needs from the design.

3. Design and Documentation

Renovation design starts with an accurate record of the house as it stands, then builds the new work around it.

A measured survey of the existing home is the base for every drawing. The design team develops a concept, the structural engineer designs any new beams, footings or bracing, and the drawings and specification are completed in enough detail to price and build.

Where new work meets old, such as a new opening in a period wall or new flooring meeting original boards, those junctions need to be detailed rather than resolved on site. Bespoke home design follows the same principles for renovations as for new homes.

‍

Vector (8)
Explore expert tips and trends in premium construction and architectural design.
Get In Touch
Get In Touch
Arrow

4. Planning and Building Approvals

Many renovations need a building permit, and some also need a planning permit, so approvals belong on the programme from the start.

  • Planning permit: depends on the zone and overlays. In a Heritage Overlay, a planning permit is generally needed to demolish or remove part of a building, make external alterations or construct new buildings. Internal alterations are exempt unless the overlay schedule applies internal controls, as Glen Eira City Council explains for clause 43.01.
  • Building permit: needed for structural work. Victoria's Building Practice Note BP-01 notes that the exemption for alterations does not cover removing or altering an element that supports another part of the building.
  • Building surveyor: you or your agent appoint the private building surveyor, who issues the building permit and inspects the work. A builder cannot appoint one on your behalf under a domestic building contract.

5. Contract, Insurance and Payments

A major renovation needs a formal contract, and its payment terms should match the work actually completed.

  • Contract: work involving more than one trade and worth more than $10,000 needs a major domestic building contract before work starts, and only a registered builder can enter into one (Consumer Affairs Victoria).
  • Home Warranty: the scheme covers eligible domestic building contracts over $20,000 signed on or after 1 July 2026 (vic.gov.au). Confirm your contract is covered before work starts.
  • Progress payments: pay only for work that is complete, as set out in the contract.
  • Variations: hidden conditions are common in renovations, so agree how variations will be priced and approved in writing before any extra work proceeds.

6. Prepare to Move Out or Stay

Deciding where you will live during the works affects the programme, the cost and how the site is run.

Staying is possible for some renovations, but a major renovation that affects the kitchen, bathrooms or services usually makes the house hard to live in, and access for trades is easier with the house empty.

If you stay, agree which areas remain usable, how they will be protected from dust and noise, and when services will be off. Either way, plan storage for furniture, protection for any features being kept, and a conversation with neighbours about access and working hours.

7. Construction

Interior of a Melbourne home opened up during a renovation with new steel beam and timber framing

Renovation construction follows a similar order to a new build, with extra care where old and new meet.

Work begins with protection of retained areas and strip-out of what is being replaced. Any hidden conditions found at this point, such as decayed framing or old wiring, are assessed and priced as variations. Structural work follows, then services are run to their new positions while walls and floors are open. Linings, joinery and finishes come last.

Kitchens carry the most decisions in most renovations; the guide to luxury kitchen renovations covers that part in detail. If the work adds floor area, the guide to home extensions and additions explains the extra steps.

The quality of the finish depends on accurate set-out and protecting completed work while other trades are still on site. The guide to a high-end architectural finish explains what separates a premium result from a standard one.

8. Inspections, Certificates and Handover

Renovated living room with restored period cornices and fireplace alongside new timber joinery

The renovation is complete when the building surveyor signs off the work and you have the certificates and a defects list.

The building surveyor inspects the work at the stages listed on the building permit. Renovations and extensions usually end with a Certificate of Final Inspection rather than an occupancy permit, which is issued for new homes (Consumer Affairs Victoria). You should also receive:

  • Plumbing compliance certificate: required when plumbing work is worth more than $750, and for some gas work regardless of cost (Building and Plumbing Commission).
  • Certificate of Electrical Safety: issued by the Registered Electrical Contractor for electrical work (Energy Safe Victoria).
  • Manuals and warranties: for appliances, systems and finishes.

Walk through the finished home in daylight and with the lights on, record any defects in writing with photos, and agree when each will be fixed.

Planning a Luxury Renovation

A renovation that follows these stages gives you clear decisions at each step and fewer surprises once the walls are open. ROMAAC Group offers renovation and remodelling for homes across Melbourne. Make an enquiry to talk through your plans.

FAQs

1. Do I need a planning permit to renovate in Melbourne?

It depends on the zone and overlays that apply to your property. Many internal renovations do not need one, but external changes, demolition or new construction can, particularly in a Heritage Overlay. A Planning Property Report shows which controls apply, and your council can confirm whether your plans need a permit.

2. Can I renovate a house in a Heritage Overlay?

Yes. A Heritage Overlay does not stop renovation, but a planning permit is generally needed for demolition, external alterations and new construction. Internal alterations are exempt unless the overlay schedule applies internal controls. Designs that respect the original street presentation are usually easier to approve, so involve your design team early.

3. Can I live in my home during a major renovation?

Sometimes, but it depends on the scope. If the kitchen, bathrooms or services are affected, the house can be hard to live in, and works often run more efficiently when it is empty. If you stay, agree with your builder which areas stay usable, how they are protected and when services will be off.

4. What paperwork should I receive when a renovation is finished?

A Certificate of Final Inspection from the building surveyor, a plumbing compliance certificate where plumbing work exceeded $750 or included certain gas work, a Certificate of Electrical Safety for electrical work, and manuals and warranties for appliances and systems. Keep these together, as you may need them when selling or making a warranty claim.

5. Should I renovate or knock down and rebuild?

Renovating suits homes with sound structure, features worth keeping or heritage controls that limit demolition. Rebuilding can suit homes in poor condition or where the layout cannot meet your brief. Compare both early, using a structural assessment, planning controls and realistic quotes, before committing to a design.

‍

CHECKOUT OUR LATEST BLOG POSTS
November 13, 2026
Queenslander House Guide: Features, History and Modern Queenslander Designs
This is some text inside of a div block.
November 13, 2026
Cost Plus Contract vs Fixed Price: Costs, Risks and Differences in Victoria
This is some text inside of a div block.
November 13, 2026
Raked Ceiling Designs: Benefits, Costs and Comparison With Vaulted Ceilings
This is some text inside of a div block.