A 1970s brick house renovation in Australia usually starts from a better base than the dated look suggests. In a brick veneer house, a frame carries the roof and floors and the brick is only an outer skin, so walls can move, the facade can change and insulation can go in. Fix what the walls and roof hide first, then rework the plan, then the facade.
ROMAAC Group carries out major renovations and extensions across Melbourne and Victoria, with licensed building capability in Queensland. On a brick veneer house, that work starts with what sits behind the brick.
Asbestos, energy and building guidance for Victoria and Queensland in this article was checked on 24 November 2026. Rules vary between councils, so confirm your own house with the council and a registered building surveyor (Victoria) or building certifier (Queensland).
Work in the order things get covered up. Whatever will end up behind new linings, render or cladding has to be found and fixed before those finishes go on:
Many owners would rather start with the facade, because the front is what bothers them. That is how a crack that needed an engineer gets rendered over, or a wall that should have been insulated gets clad.
A brick veneer house is a framed house wearing a brick skin. YourHome, the Australian Government's guide to sustainable homes, describes brick veneer construction as bricks forming the external skin of a timber or steel framed home, with the frame providing the strength and stability.
The brick sits just outside the frame across a narrow cavity, held to it by wall ties. Because brickwork is not completely waterproof, the wall relies on damp-proof courses (a layer that stops moisture rising), flashings (strips that turn cavity water outwards) and weep holes (open joints where that water drains). YourHome also notes that brick veneer footings are generally smaller than those for cavity brick.

That construction shapes the whole renovation:
A building inspection, an asbestos survey and an electrician's check should come before any design. Around fifty years of ground movement, weather and earlier owners' handiwork leave problems that are easy to plan around and costly to find halfway through the build.
| Area | What to look for | Who confirms it |
|---|---|---|
| Footings and floor | Stepped cracks in the brickwork, sticking doors, uneven floors | Building inspector or structural engineer |
| Brick skin, ties and weep holes | Cracked or bulging brickwork, corroded ties, weep holes buried under garden beds or paving | Building inspector; a bricklayer for repairs |
| Roof | Cracked or slipped tiles, worn flashings, a sagging ridge, ceiling stains | Roof plumber or building inspector |
| Possible asbestos | Eaves, cladding, fences, wet areas, vinyl floor tiles, flues | Asbestos assessor, with laboratory testing |
| Wiring | An old fuse board, ageing cabling, earlier DIY work | Licensed electrician |
| Insulation | What is in the ceiling, and whether the walls have any | Energy assessor or insulation installer |
| Windows | Single glazing, worn seals, draughts around frames | Builder or window specialist |
| Earlier additions | Enclosed carports and rear rooms added after the original build | Council records; building surveyor (Victoria) or certifier (Queensland) |
Assume a 1970s house contains asbestos until testing says otherwise. The Victorian Asbestos Hub's page on where asbestos is found says a home built or renovated before 1990 likely contains it, in places such as eaves, wall cladding, fences, wet-area linings and vinyl floor tiles, and that only laboratory testing of a sample can confirm it.
The eaves need early attention on a brick house, since a new roof, render or cladding all work right up against them. Victoria and Queensland set different limits on what a homeowner may remove, but the safe course in either state is a licensed removalist and the clearance steps set out for renovating a 1950s weatherboard house.
The biggest gain is usually at the back of the house. Plans of the period often keep the kitchen, meals area and lounge as separate rooms with one sliding door to the yard, and joining them into a single north-facing living area is where open plan layouts do the most for an older home.
Which internal walls can go depends on the roof. A pitched roof framed on site often has struts bearing on internal walls, while a trussed roof usually spans between the external walls, so an engineer confirms the load-bearing walls and sizes any beam before demolition.
Each wall that comes out brings other decisions with it:
Updating a 1970s house exterior can mean anything from cleaning the brick to cladding over it, with paint, limewash, render, a new roof colour, windows and landscaping in between. YourHome says bricks remain stable and colour-fast and do not need to be rendered or painted, so every coating is a design choice that brings its own upkeep.
That freedom is what separates a 1970s house from an Edwardian house renovation, where the street front is the part the work sets out to protect. Even so, check the planning property report for an overlay before you choose a finish.
| Option | What it changes | Trade-offs | Check first |
|---|---|---|---|
| Clean and repoint | Freshens the brick, keeps its colour | The smallest change | Whether cracks point to movement |
| Paint | New colour, brick texture kept | Needs repainting; very hard to undo | A masonry paint, weep holes left open |
| Limewash | Softer colour with brick showing through | Wears back; results vary with the brick | A test patch on your own brick |
| Render | A smooth, even finish | Shows cracks and dirt; hardest to reverse | Weep holes, vents and movement joints kept open |
| Cladding over the brick | A new face in timber, fibre cement or metal | Deeper window reveals, extra fixings and weight | Fixings, load and the site's bushfire rating |
| New roof covering or colour | One of the largest surfaces seen from the street | Major work against the eaves | Roof frame condition; eaves tested for asbestos |
| New windows and entry | New frames, glass and front door | Flashings redone around each frame | Glass and frame performance |
| Landscaping and front fence | Softens the base of the house | Least disruptive; planting takes time | Beds and paving kept below the weep holes |
Rendering a brick house gives the cleanest change of look and is the hardest to walk back. Over brick veneer, the weep holes and wall vents must stay open, because the cavity behind still has to drain and breathe.
Movement joints in the brickwork (vertical gaps that let sections of wall move) need to carry through the render, or it tends to crack along them. Ask which system suits your brick, acrylic or cement-based, and how often its colour coat will need renewing.

Cladding over brick usually means fixing battens to the brickwork and the new boards or panels to the battens. The wall face moves outwards, so reveals get deeper and the sills, flashings and eaves junction all need new detailing, and the fixings into old brick and the added weight should be checked.
In a bushfire-prone area, the bushfire attack level (BAL, a rating of a site's exposure to embers, heat and flame) can rule some products out, because timber, fibre cement and metal cladding reach different BAL ratings.
The roof fills a large share of the street view, so a new covering or colour changes the house noticeably, though it brings the eaves and their asbestos question with it. Windows are easier than they look: YourHome says most doors and windows are made to suit standard brick sizes, so better-glazed replacements can usually fit the existing openings.
Insulate the ceiling first, the walls when the linings come off, then the windows and draughts. YourHome's insulation guide puts a typical brick veneer wall at about R0.56 (R-value measures resistance to heat flow, so higher is better), and notes that summer heat stored in the brick is released into the evening, just when you want the house to cool.
The same guide estimates that roof and ceiling insulation can save 45 per cent or more on heating and cooling costs, and wall insulation around 15 per cent. It also advises having a licensed electrician check the wiring and fittings before insulation goes into an existing home.
| Element | Typical starting point | Upgrade route | Caution |
|---|---|---|---|
| Ceiling | None, or old and patchy batts | Bulk insulation between the joists | Electrician's check first; a licensed asbestos assessor if loose-fill asbestos is suspected |
| External walls | About R0.56 | Batts between the studs while linings are off | Cavity fill carries a high moisture risk behind a timber frame |
| Timber floor, if present | About R0.25 for 19 mm of timber | Insulation fixed under the joists | Keep the subfloor ventilated and termite barriers visible |
| Windows | Single glazing in aluminium frames | Double glazing, or secondary glazing | Plain aluminium conducts heat; look for thermal breaks |
| Draughts | Gaps at doors, windows, exhaust fans and downlights | Draught sealing and weatherstrips | Keep the ventilation an open-flued gas heater needs |
Walls are the hard part, because the cavity is hidden. YourHome lists cavity fill and insulating during recladding or relining as the usual routes, but warns that cavity fill carries a high risk of moisture getting in with timber-framed construction.
In a veneer wall that cavity is also the drainage path, and cladding over the brick does not open up the frame. The practical moment is when the internal plasterboard comes off and batts can go between the studs, after a suitably qualified practitioner has assessed the wall.

Single-glazed originals lose heat through the glass and the frame. Double glazing in thermally broken frames (frames with an insulating barrier inside) deals with both, while secondary glazing, a second pane fitted inside the existing frame, suits windows worth keeping.
If the house has an open-flued gas heater, ask a licensed gasfitter what ventilation it needs before sealing draughts. In south-east Queensland, where the main job is keeping summer heat out, roof insulation, shading and cross-ventilation do more than they would in Melbourne.
A ground floor rear extension is usually the simpler way to add room. A second storey is possible, but the house was built to carry one level, so an engineer checks the footings and frame first; where they cannot take the load, one approach is to carry the new floor on its own posts, beams and footings.
The choice between second storey and ground floor extensions usually turns on three things:
The cost depends mostly on what the inspection finds and how much new building the brief asks for, which is why it cannot be pinned down before both are known. The main drivers are:
Ask which items in a quote are provisional sums, meaning estimates adjusted once the real cost is known, and keep a contingency for whatever the inspection could not see.
Structural work, an extension or a second storey needs a building permit in Victoria or a building approval in Queensland, and an overlay can add a planning permit before that. In Victoria, the Building and Plumbing Commission's guidance on when a building permit is required says all building work needs one unless the regulations exempt it, and any planning permit must be issued by the council first.
Overlays can catch facade work too. Where a Heritage Overlay applies, Clause 43.01 of the Victoria Planning Provisions requires a planning permit to render a building or paint an unpainted surface such as face brick, and the planning property report from VicPlan shows which overlays affect your lot.
In Queensland, the Queensland Building and Construction Commission (QBCC) makes it the home owner's responsibility to have building approvals in place before work starts, even with a builder engaged. A building certifier assesses the plans and inspects key stages, and the builder usually engages one for you.
Look for a registered builder with structural renovations and extensions behind them, who wants the inspection, asbestos survey and engineering done before pricing the build. Before you sign, check:
ROMAAC's pre-construction planning works through site conditions, scope, approvals and preliminary costing before construction is committed, which is where most of these questions get answered.
A rebuild starts to make sense when the problems stack up: the footings, frame and roof all need major work, asbestos runs through most of the linings, and the living areas cannot reach the north or the garden without demolishing most rooms. A renovation can usually absorb one of those, but all of them together leave little worth paying to keep.
Paperwork and inspections come before any drawing, and approvals before any demolition:
There is no fixed lifespan for a house of this age. A 1970s brick veneer house lasts as long as its footings, frame and roof stay sound and its cavity keeps draining, which comes down to maintenance and the ground it sits on. A building inspection shows where a particular house stands before you spend money on it.
Not automatically. In Victoria the 7-star standard, with a whole-of-home rating of at least 60 under NatHERS (the Nationwide House Energy Rating Scheme), has applied to new homes since 1 May 2024. For an extension or substantial renovation (for example more than 50 per cent), the Building and Plumbing Commission's page on energy efficiency requirements says current requirements may apply, with a registered building surveyor deciding how far.
A facade drawn before anyone has tested the eaves, checked the walls or looked at the footings often ends up redrawn. A design built on the inspection, the asbestos survey and the engineer's advice tends to hold. That early stage is the right time for a conversation with ROMAAC about your 1970s house, while the plan can still follow what the inspection finds.