



The luxury home features that make the biggest difference are the ones planned into the design from the start: a butler's pantry, a wine cellar, a home cinema, a wellness room, an ensuite retreat, a pool and an outdoor kitchen.
Each needs floor area, structure or services that are difficult and expensive to add once the frame is up. The key is knowing when each feature has to be decided. This guide follows that order, from the first brief to handover, using examples from homes ROMAAC Group has built.
Most luxury features need to be locked in at brief or concept stage, well before construction starts.

Rooms with a dedicated purpose need to be in the brief, because they take floor area that cannot be found later.
A butler's pantry sits behind or beside the main kitchen and handles preparation, storage and cleaning up, so the main kitchen stays clear when guests arrive. It needs its own plumbing, power and ventilation, and its position decides how the kitchen works. The North Warrandyte home includes one, keeping kitchen work out of the entertaining space.
A wine cellar needs a room that holds a stable temperature, which means insulation, a climate control unit and a location away from western sun and hot-water services. The Camberwell home includes a bespoke wine cellar planned as part of the living areas rather than tucked away. A home cinema works best as an internal room, with acoustic separation from bedrooms and light control.
A home office needs a quiet spot, data points and daylight, ideally with a door that closes. A wellness room for a sauna, steam room or gym needs space, a dedicated power supply and ventilation; check the equipment maker's requirements before the plans are finalised.
Design elements such as double-height living, statement staircases and floor-to-ceiling glazing are covered in the guide to architectural features in premium homes.

A pool and outdoor kitchen should be designed with the house, because orientation, levels and access affect both.
Placing the pool where it gets afternoon sun, sightlines from the living areas and access for excavation machinery is far easier on a blank site than after landscaping. The North Warrandyte home has a 13-metre lap pool finished with recycled glass mosaic tiles, overlooked by a balcony. At Burleigh Waters, an infinity-edge pool sits beside a tiered fire pit and an integrated courtyard, with large glass panels framing the view from inside.
Outdoor kitchens need gas or electrical supply, drainage and weather protection, so plan them with the alfresco roof and services rather than adding them at the end.
In Victoria, pools and spas that can hold more than 30 cm of water must be registered with the local council.
For a permanent pool, the Building and Plumbing Commission requires the certificate of barrier compliance to be lodged with the registration application within 30 days of the occupancy permit or certificate of final inspection, and a new certificate to be lodged every four years. Design the barrier with the pool, not after it.

Kitchens and ensuites carry the most selections in the house, and most of them need to be final before construction starts.
Integrated appliances set the joinery dimensions, and stone selections decide where benchtop joins fall. The Camberwell kitchen pairs Calacatta marble benchtops with premium veneer joinery and Abbey tapware. The guide to custom finishes for high-end homes covers material choices in more detail, and planning a luxury kitchen renovation follows similar steps in an existing home.
In the ensuite, a steam shower needs a sealed enclosure, a steam generator with access for servicing, and suitable waterproofing and ventilation. A large freestanding bath can be heavy when full, so confirm the floor structure with your engineer before the frame is built. Heated floors need their own circuit and must go in before tiling.
Many luxury features depend on cabling, plumbing and ventilation that must be installed while the walls are open.
The final stage is where each system is installed, tested and explained, so you can use what you paid for.
At fit-off, appliances, fixtures and equipment are connected, and automation scenes are programmed to suit how you live. Before handover, each system should be tested in front of you, with manuals, warranties and service contacts supplied.
For the pool, lodge the registration and barrier certificate with council within the required time. A careful pre-handover inspection also catches finish defects; the guide to achieving a high-end architectural finish explains what to check.
The best luxury features match how you live, not a list of what other homes have.
Start the brief by describing a typical week: how you cook, entertain, work, unwind and use the garden.
Features that support those routines earn their place; features that sound impressive but would rarely be used take floor area and budget from those that would. A pre-construction checklist helps you lock these decisions in at the right time.
ROMAAC Group builds custom homes across Melbourne, and its portfolio shows how planned features come together, from the North Warrandyte butler's pantry and lap pool to the Camberwell wine cellar and marble kitchen. Make an enquiry to talk through the features you want in your home.
Features that suit how you live and are built well. Common examples include a butler's pantry, a wine cellar, a home cinema, a spa-style ensuite, a wellness room, a pool with outdoor living and integrated home automation. The most successful are planned into the design early, so they fit the floor plan and services properly.
A butler's pantry is a secondary kitchen space behind or beside the main kitchen, used for preparation, storage and cleaning up. It keeps the main kitchen tidy when entertaining. It is worth including if you cook often or host regularly, but it needs floor area, plumbing and ventilation planned from concept design.
At brief and concept design stage. Both need a dedicated room, and each has specific requirements: a cellar needs insulation and climate control, while a cinema needs acoustic separation, light control and cabling. Adding either after the floor plan is set usually means losing space elsewhere or reworking walls and services.
Yes. Pools and spas that can hold more than 30 cm of water must be registered with the local council. For a new permanent pool, the certificate of barrier compliance is lodged with the registration application within 30 days of the occupancy permit or certificate of final inspection, and a new certificate is lodged every four years.
Many can, through a renovation or extension, but some are much harder than in a new build. Features that need floor area, structural changes or new services, such as a cellar, cinema or steam shower, may involve significant work. An assessment of the existing structure and services shows what is practical.


