The smart home features worth having in a new build are the ones planned before the plaster goes on. That means deciding what you want the home to do, choosing a wired or wireless system, fixing where every switch, sensor and speaker goes, and running the cabling while the walls are open.
Devices can be swapped later. Cabling, conduit and a well-placed comms cabinet are hard and expensive to add once the home is finished. This guide follows those decisions in the order they arise in a build.
Start with how you live, not with a product list, because every feature you choose adds cabling, cost and things to maintain.
Most smart home features fall into a handful of groups:
Think about the next ten years as well as move-in day. Ageing parents, children growing into teenagers or a future home office can all change what you need, and cabling for those possibilities is far cheaper now than later.
Rank them. A family that entertains outdoors might put audio and lighting scenes first, while someone who travels often might put security and remote climate control at the top. A ranked list keeps the budget on what you will actually use, and tells the designer where cabling matters most.
The biggest technical decision is whether the core of the system is hardwired or wireless, and it needs to be made before design is finalised. Hardwired systems run dedicated control cabling to switches, sensors and devices.
They are generally more reliable, do not depend on Wi-Fi and suit a whole-home approach, but they must be planned and installed during construction. ROMAAC's Camberwell and North Warrandyte homes both use CBUS automation, a hardwired system controlling lighting, ambient scenes and entertainment.
Wireless systems use app-based devices that talk over Wi-Fi or other wireless protocols. They are easier to add and change later, but depend on strong network coverage and can be less consistent across a large home.
Many new builds use both: a hardwired backbone for lighting and core controls, with wireless devices added where flexibility matters. Whichever you choose, appoint the installer early so they can mark up the drawings.

Every smart device needs a fixed position on the drawings, because the cabling route depends on it.
Work through the plan room by room with the designer and installer. Key items to locate include:
Energy features tie into the design itself. New Victorian homes must meet a 7-star NatHERS rating and a Whole of Home energy budget, according to Energy Victoria, and new homes needing a planning permit are now built all-electric. Energy monitoring, solar and battery-ready wiring fit naturally into that brief.

Pre-wire is the cheapest moment to install smart home cabling, because walls and ceilings are still open.
At frame stage, the electrician and cabler run power, control and data cabling to every planned location and back to the comms cabinet. Adding spare conduit to key points, such as TV walls, the roof space for future solar or antennas, and the garage for EV charging, costs little now and saves cutting into finished walls later.
Every cable should be labelled at both ends and recorded. Before plasterboard goes up, walk the site with the installer to check that cables match the plan.
Data and telecommunications cabling should be installed by a registered cabler, which the Australian Communications and Media Authority (ACMA) recommends so the work follows the right rules and standards. You can check a cabler on the ACMA register.
Fit-off is where devices are installed and the system is programmed to work the way you live.
After painting, switches, keypads, sensors, speakers and blind motors are fitted, and the system is programmed with scenes and schedules.
A scene might dim the living room lights and close the blinds at once, while a schedule might bring the heating on before you wake.
Ask for a test session before handover. Use every scene and app function yourself, so adjustments happen while the installer is still on site.
Check the network at the same time. Smart devices rely on it, so confirm Wi-Fi coverage in every room, including outdoor areas and the garage, and make sure the internet connection and router sit in the comms cabinet rather than wherever the connection happened to enter the house. Ask how software updates are handled and who is responsible for them after handover.
A smart home handover should leave you with the paperwork, logins and knowledge to run and maintain the system.
In Victoria, electrical work for a customer must be carried out by an electrician working for a Registered Electrical Contractor. The contractor provides a Certificate of Electrical Safety, according to Energy Safe Victoria. Where the builder engaged the electrician, you can request a copy.
Beyond certificates, ask for:
Smart home upgrades are possible in an existing house, but the best time is when walls are already open during a renovation.
Wireless devices, smart thermostats, app-controlled lighting and smart locks can be added with little disruption. Hardwired systems and new cabling are much easier during a renovation or extension, when wall linings and ceilings come off anyway. If you are planning renovation work, add smart home cabling to the scope rather than treating it as a separate project.
Smart home features are easiest and most affordable when they are part of the design from the start. ROMAAC Group's smart home integration is planned alongside the build, and a pre-construction consultation is the place to decide what your home should do.
Prioritise the features you will use daily, typically lighting control, heating and cooling, security and access, and energy monitoring with solar and EV charging. Whatever you choose now, include data cabling to key rooms, Wi-Fi access points, a proper comms cabinet and spare conduit, so you can add devices later without opening walls.
Hardwired systems are generally more reliable and suit whole-home control, but must be installed during construction. Wireless systems are easier to add and change, but depend on strong network coverage. Many new builds combine the two, using a hardwired backbone for lighting and core controls and wireless devices where flexibility matters more.
Smart home wiring should be planned during design and installed at pre-wire, after the frame is up and before plasterboard is fitted. This is when cabling and conduit can be run cheaply to every planned location. Walk the site with the installer before lining to confirm every cable matches the plan.
Electrical work must be carried out by an electrician working for a Registered Electrical Contractor, who provides a Certificate of Electrical Safety, according to Energy Safe Victoria. For data and telecommunications cabling, the ACMA recommends using a registered cabler. Check both before work starts, and keep the certificates with your handover documents.
Yes. Wireless devices such as smart thermostats, app-controlled lighting and smart locks can be added with little disruption. Hardwired systems and new cabling are far easier during a renovation, when walls and ceilings are already open, so include smart home cabling in the renovation scope rather than adding it afterwards.